• GOLD: $ 2233.48 +0.62%
  • SELG: 73.93 ₽ +0.26%
  • ROLO: 1.18 ₽ -1.03%
Ru

Operations and projects

Poisk

  • Location
    Altai region
  • Mining
    Open-pit
  • Deposits
    Murzinskoye
  • Processing
    Heap leaching, gravity plant
477 kg
gold production in 2022
1,394 kg
C1 + C2 gold reserves as at January 1, 2023

OPERATING RESULTS FOR 2020-2022

Production complex 2020 2021 2022 
Run-of-mine material thousand m³ 2,930
- 49
Ore mined thousand t 730 - 19 
Ore stockpiled thousand t 1,043 - 16
Doré gold produced kg 517 465  475
Gold produced kg 529 478 477

Polymetallic Holding SELIGDAR uses cookies to optimise the usability of the website. If you do not want us to use cookies, you can change your browser settings, or you may not be able to access our site.

If you continue using the website, you consent to the use of your cookies.

Ok, thank you