Pravourmiyskiy

  • Location
    Khabarovsk region
  • Mining
    Underground mine
  • Deposits
    Pravourmiyskoye
  • Processing
    Processing plant
1,257 tonnes
tin produced in 2021
68 thousand tonnes
B+C1+C2 tin reserves as at January 1, 2022
35 thousand tonnes
B+C1+C2 copper reserves as at January 1, 2022
3 thousand tonnes
B+C1+C2 tungsten trioxide reserves as at January 1, 2022

The audit of the mineral resources and ore reserves of the deposit in accordance with the JORC code was carried out in 2012 and 2019. According to the latest report, Probable reserves amounted to 57.6 thousand tonnes of tin; Indicated resources comprised 91.3 thousand tonnes and Inferred, 4.4 thousand tonnes.

OPERATING RESULTS FOR 2019-2021

Production complex
2019 2020 2021
Ore mined thousand t 226 243 273
Ore processed thousand t 222 243 245
Tin in concentrate produced t 1 402 1 201 1 257
Tungsten in concentrate produced t 79 72 47