Operations and projects

Pravourmiyskiy

  • Location
    Khabarovsk region
  • Mining
    Underground mine
  • Deposits
    Pravourmiyskoye
  • Processing
    Processing plant
1,242 tonnes
tin produced in 2024
58,9 thousand tonnes
B+C1+C2 tin reserves as at January 1, 2025
24,1 thousand tonnes
B+C1+C2 copper reserves as at January 1, 2025
2,0 thousand tonnes
B+C1+C2 tungsten trioxide reserves as at January 1, 2025

The audit of the mineral resources and ore reserves of the deposit in accordance with the JORC code was carried out in 2012 and 2019. According to the latest report, Probable reserves amounted to 57.6 thousand tonnes of tin; Indicated resources comprised 91.3 thousand tonnes and Inferred, 4.4 thousand tonnes.

OPERATING RESULTS FOR 2022-2024

Production complex
2022 2023 2024
Ore mined thousand t 363 481 575
Ore processed thousand t 267 445 553
Tin in concentrate produced t 1,300 1,252 1,242
Copper in concentrate produced t - 6 197
Tungsten in concentrate produced t 65 41 30