Sininda



LocationRepublic of Buryatia
MiningAlluvials, Underground mine
DepositsAlluvials; Nerundinskoye ore deposit
ProcessingSand washing; gold processing plant, gravity plant
Production103 kg of gold in 2020
Reserves* Alluvial gold reserves: 0.9 tons; ore gold reserves: 4.4 tons
* Russian classification compliant with the State Commission on Mineral Reserves (GKZ) reporting system


Operating Results

 201820192020
Run-of-mine material, thousand m³1,2581,66314
Ore mined, thousand tons463231
Ore processed at gold processing plant, thousand tons02257
Sands mined and washed, thousand m³ 1191960
Gold produced, kg11894103


Gold Reserves as of 01.01.2021
Russian classification compliant with the State Commission on Mineral Reserves (GKZ) reporting system
 Ore, MtAverage grade, g/tGold, kg
Ore gold reserves0.76.154,351
Sand, thousand m³Average grade, g/m³Gold, kg
Alluvial gold reserves 0.521.64858

2020 Annual Report (pdf, 9 Мб)
25.05 09:04
1858 $/oz -0.4%
MOEX: SELG
47.02 -1.86%