Sininda



LocationRepublic of Buryatia
MiningAlluvials, Underground mine
DepositsAlluvials; Nerundinskoye ore deposit
ProcessingSand washing; gold processing plant, gravity plant
Production103 kg of gold in 2020
Reserves* Alluvial gold reserves: 0.9 tons; ore gold reserves: 4.4 tons
* Russian classification compliant with the State Commission on Mineral Reserves (GKZ) reporting system


Operating Results

 201920202021
Run-of-mine material, thousand m³1,6631436
Ore mined, thousand tons323173
Ore processed at gold processing plant, thousand tons225761
Sands mined and washed, thousand m³ 1960-
Gold produced, kg94103121


Gold Reserves as of 01.01.2021
Russian classification compliant with the State Commission on Mineral Reserves (GKZ) reporting system
 Ore, MtAverage grade, g/tGold, kg
Ore gold reserves0.76.154,351
Sand, thousand m³Average grade, g/m³Gold, kg
Alluvial gold reserves 0.521.64858

2021 Annual Report (pdf, 16 Мб)
09.12 15:05
1812.1 $/oz +0.64%
MOEX: SELG
45.43 -0.79%