• GOLD: $ 3654.71 -0.12%
  • SELG: 46.43 ₽ +0.37%
  • ROLO: 0.57 ₽ +0.11%
Ru

Operations and projects

Nizhne-Yakokitskiy

  • Location
    Republic of Sakha (Yakutia)
  • Mining
    Open-pit
  • Deposits
    Nizhne-Yakokitskoye ore field
  • Processing
    Heap leaching, separate ore processing facility
2,558 kg
gold production in 2024
35,337 kg
C1 + C2 gold reserves as at January 1, 2025

Mineral resources and ore reserves of the Nizhne-Yakokitskoye ore field deposits were audited in accordance with the guidelines of the JORC Code. The Probable reserves were estimated at 33,865 kg of gold; Indicated resources, at 34,596 kg of gold and Inferred, at 2,386 kg.


Operating results for 2022-2024

Production complex
2022 2023 2024
Run-of-mine material
thousand m³  15,903 12,693 14,702
Ore mined thousand (in dry weight) thousand t  6,824 3,922 3,177
Ore stockpiled thousand t  4,327 4,563 3,883
Doré gold produced  kg 3,256 3,111 2,551
Gold produced kg
3,261 3,142 2,558

Polymetallic Holding SELIGDAR uses cookies to optimise the usability of the website. If you do not want us to use cookies, you can change your browser settings, or you may not be able to access our site.

If you continue using the website, you consent to the use of your cookies.

Ok, thank you