Seligdar is the operator of the project of ore mining at the Lunnoe deposit in a joint venture with Atomredmetzoloto JSC. Seligdar owns 49% in the joint venture.


OPERATING RESULTS FOR 2019-2021

Production complex
2019 2020 2021
Run-of-mine material thousand m³ 3 974 3 717 4 422
Ore mined thousand t 985 1 034 861
Ore stockpiled thousand t 553 658 680
Gold produced kg 430 482 528