Operations and projects

Lunny

  • Location
    Republic of Sakha (Yakutia)
  • Mining
    Open-pit
  • Deposits
    Lunnoe
  • Processing
    Heap leaching
348 kg
gold production in 2022
5,758 kg
C1 + C2 gold reserves as at January 1, 2023

Seligdar is the operator of the project of ore mining at the Lunnoe deposit in a joint venture with Atomredmetzoloto JSC. Seligdar owns 49% in the joint venture.


OPERATING RESULTS FOR 2020-2022

Production complex
2020 2021 2022
Run-of-mine material thousand m³ 3,717 4,422 3,481
Ore mined thousand t 1,034 861 1,158 
Ore stockpiled thousand t 658 680 655
Doré gold produced kg 483 529 347
Gold produced kg 482 528 348 