Podgolechny

  • Location
    Republic of Sakha (Yakutia)
  • Mining
    Open-pit
  • Deposits
    Yasnaya polyana
  • Processing
    Heap leaching

OPERATING RESULTS FOR 2019-2021

Production complex 2020 2021 2022
Run-of-mine material thousand m³ 1,118 - -
Ore mined thousand t 536 - -
Ore stockpiled thousand t 443        -
-
Doré gold produced kg 161 - -
Gold produced kg 161 - -