• GOLD: $ 2650.68 -0.07%
  • SELG: 51.97 ₽ -0.15%
  • ROLO: 0.75 ₽ +5.44%
Ru

Operations and projects

Lunny

  • Location
    Republic of Sakha (Yakutia)
  • Mining
    Open-pit
  • Deposits
    Lunnoe
  • Processing
    Heap leaching
348 kg
gold production in 2022
5,758 kg
C1 + C2 gold reserves as at January 1, 2023

Seligdar is the operator of the project of ore mining at the Lunnoe deposit in a joint venture with Atomredmetzoloto JSC. Seligdar owns 49% in the joint venture.


OPERATING RESULTS FOR 2020-2022

Production complex
2020 2021 2022
Run-of-mine material thousand m³ 3,717 4,422 3,481
Ore mined thousand t 1,034 861 1,158 
Ore stockpiled thousand t 658 680 655
Doré gold produced kg 483 529 347
Gold produced kg 482 528 348 

Polymetallic Holding SELIGDAR uses cookies to optimise the usability of the website. If you do not want us to use cookies, you can change your browser settings, or you may not be able to access our site.

If you continue using the website, you consent to the use of your cookies.

Ok, thank you