• GOLD: $ 2321.7 -0.03%
  • SELG: 74.02 ₽ -0.04%
  • ROLO: 1.24 ₽ 0%
Ru

Operations and projects

Pyrkakay stockworks

  • Location
    Chukotka Autonomous Okrug
6 million t
expected volume of mined ore
243 thousand t
tin reserves
16 thousand t
tungsten trioxide reserves
Start of the project

August 2020 - Rusolovo PJSC (Seligdar’s subsidiary) won the auction for the Pyrkakay Stockworks deposit

June 2021 - the license was transferred to Territoriya LLC (Rusolovo PJSC’s subsidiary)

Schedule of deposit development
  • 2021
    exploration started, technological samples were taken from core holes
  • 2022
    engineering studies and design
  • 2025-2026
    construction
  • 2030
    full ramp up

Balance reserves*
Tin 243 thousand t
Tungsten trioxide 16 thousand t
Off-balance reserves
Tin 24 thousand t
Tungsten trioxide 2 thousand t
Prognostic resources
Tin 11 thousand t
Copper 63 thousand t
Tungsten trioxide 1 thousand t


* Russian classification compliant with the State Commission on Mineral Reserves (GKZ) reporting system.

Polymetallic Holding SELIGDAR uses cookies to optimise the usability of the website. If you do not want us to use cookies, you can change your browser settings, or you may not be able to access our site.

If you continue using the website, you consent to the use of your cookies.

Ok, thank you